Hut 8
Hut 8 Corp
- Seam
- Mining to HPC
- Status
- Mainnet
- Live since
- 2018
- Verified
- 2026-09-12
Building to NVIDIA reference architecture, which is the tell that this is no longer a mining company.
Project site ↗Sourced figures
- Contracted IT capacity352 MW
Megawatts of datacentre IT load the operator has under signed contract for HPC or AI hosting.
Beacon Point, Nueces County TX — a 15-year, $9.8B lease. Lifts total contracted AI capacity to roughly 597 MW.
Source ↗
The silicon
NVIDIA DSX facility
NVIDIABeacon Point is built to the NVIDIA DSX reference architecture rather than retrofitted from mining halls, which is the structural difference between a pivot and a rebrand.
Source ↗