Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 38 fields comparable

⇄ swap sides
SpecAuroraFigure 02
AcceleratorIntel Data Center GPU Max—
AI Inference Uplift X—3
AI Partner—OpenAI partnership models
Announcement Date—2024-08-06
ArchitectureHPE Cray EX with Intel Exascale Compute Blade—
Battery Energy Uplift PCT—50
Battery KWH—2.25
BMW Area—body shop (sheet-metal loading for welding)
BMW Deployment Months—11
BMW Parts Loaded MIN—90,000
BMW Runtime Hours MIN—1,250
BMW Shift Hours—10
BMW X3 Vehicles MIN—30,000
Cores9,264,128—
CPUIntel Xeon CPU Max 9470 52C 2.4GHz—
Deployment Partner—BMW Manufacturing (Spartanburg, SC)
Deployment Status—retired
Hand DOF—16
Hand Payload KG—25
Height CM—168
Installation Year2,023—
InterconnectHPE Slingshot-11—
LocationDOE/SC/Argonne National Laboratory—
ManufacturerIntel / HPE—
Power KW38,698.36—
Rapid Charge Hours—1.5
Retirement Started—2025-11-19
RGB Cameras—6
Rmax Pflops1,012—
Rpeak Pflops1,980.01—
Runtime Hours—5
Status Checked—2026-09-24
Successor—Figure 03
Successor BMW Project Announced—2026-06-25
Successor Introduced—2025-10-09
Top500 Rank Jun20264—
Top500 Rank Nov20253—
Weight KG—70