Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 41 fields comparable

⇄ swap sides
SpecEl CapitanFigure 02
AcceleratorAMD Instinct MI300A (APU)—
AI Inference Uplift X—3
AI Partner—OpenAI partnership models
Announcement Date—2024-08-06
Battery Energy Uplift PCT—50
Battery KWH—2.25
BMW Area—body shop (sheet-metal loading for welding)
BMW Deployment Months—11
BMW Parts Loaded MIN—90,000
BMW Runtime Hours MIN—1,250
BMW Shift Hours—10
BMW X3 Vehicles MIN—30,000
Cores11,340,000—
CPUAMD 4th Gen EPYC 24C 1.8GHz—
Deployment Partner—BMW Manufacturing (Spartanburg, SC)
Deployment Status—retired
Hand DOF—16
Hand Payload KG—25
Height CM—168
Hpcg Tflops17,406—
Installation Year2,024—
InterconnectHPE Slingshot-11—
LocationDOE/NNSA/Lawrence Livermore National Laboratory—
ManufacturerHPE—
ModelHPE Cray EX255a—
Power KW29,684.62—
Rapid Charge Hours—1.5
Retirement Started—2025-11-19
RGB Cameras—6
Rmax Pflops1,809—
Rpeak Pflops2,821.1—
Runtime Hours—5
Status Checked—2026-09-24
Successor—Figure 03
Successor BMW Project Announced—2026-06-25
Successor Introduced—2025-10-09
Top500 Jun2026 NO1LineShine (National Supercomputing Centre in Shenzhen, China)—
Top500 Rank Jun20262—
Top500 Rank Nov20241—
Top500 Rank Nov20251—
Weight KG—70