Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 38 fields comparable

⇄ swap sides
SpecFigure 02Aurora
Accelerator—Intel Data Center GPU Max
AI Inference Uplift X3—
AI PartnerOpenAI partnership models—
Announcement Date2024-08-06—
Architecture—HPE Cray EX with Intel Exascale Compute Blade
Battery Energy Uplift PCT50—
Battery KWH2.25—
BMW Areabody shop (sheet-metal loading for welding)—
BMW Deployment Months11—
BMW Parts Loaded MIN90,000—
BMW Runtime Hours MIN1,250—
BMW Shift Hours10—
BMW X3 Vehicles MIN30,000—
Cores—9,264,128
CPU—Intel Xeon CPU Max 9470 52C 2.4GHz
Deployment PartnerBMW Manufacturing (Spartanburg, SC)—
Deployment Statusretired—
Hand DOF16—
Hand Payload KG25—
Height CM168—
Installation Year—2,023
Interconnect—HPE Slingshot-11
Location—DOE/SC/Argonne National Laboratory
Manufacturer—Intel / HPE
Power KW—38,698.36
Rapid Charge Hours1.5—
Retirement Started2025-11-19—
RGB Cameras6—
Rmax Pflops—1,012
Rpeak Pflops—1,980.01
Runtime Hours5—
Status Checked2026-09-24—
SuccessorFigure 03—
Successor BMW Project Announced2026-06-25—
Successor Introduced2025-10-09—
Top500 Rank Jun2026—4
Top500 Rank Nov2025—3
Weight KG70—