Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 39 fields comparable

⇄ swap sides
SpecFigure 02Intel Gaudi 3 HL-325L
AI Inference Uplift X3—
AI PartnerOpenAI partnership models—
Announcement Date2024-08-06—
Battery Energy Uplift PCT50—
Battery KWH2.25—
Bf16 Tflops—1,835
BMW Areabody shop (sheet-metal loading for welding)—
BMW Deployment Months11—
BMW Parts Loaded MIN90,000—
BMW Runtime Hours MIN1,250—
BMW Shift Hours10—
BMW X3 Vehicles MIN30,000—
Deployment PartnerBMW Manufacturing (Spartanburg, SC)—
Deployment Statusretired—
Ethernet Port Gbps—200
Ethernet Ports—24
Form factor—OAM
FP8 Tflops—1,835
FP8 Tflops Intel WP 2025 Table—1,678
Hand DOF16—
Hand Payload KG25—
HBM (GB)—128
HBM Type—HBM2E
Height CM168—
Memory bandwidth (TB/s)—3.7
MME Engines—8
Process Node NM—5
Rapid Charge Hours1.5—
Retirement Started2025-11-19—
RGB Cameras6—
Runtime Hours5—
Sram MB—96
Status Checked2026-09-24—
SuccessorFigure 03—
Successor BMW Project Announced2026-06-25—
Successor Introduced2025-10-09—
TDP (W)↓ better—900
TPC Engines—64
Weight KG70—