Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 34 fields comparable

⇄ swap sides
SpecNVIDIA B100Figure 02
AI Inference Uplift X—3
AI Partner—OpenAI partnership models
Announcement Date—2024-08-06
Battery Energy Uplift PCT—50
Battery KWH—2.25
BMW Area—body shop (sheet-metal loading for welding)
BMW Deployment Months—11
BMW Parts Loaded MIN—90,000
BMW Runtime Hours MIN—1,250
BMW Shift Hours—10
BMW X3 Vehicles MIN—30,000
Chip TO Chip Interconnect TB S10—
Deployment Partner—BMW Manufacturing (Spartanburg, SC)
Deployment Status—retired
Hand DOF—16
Hand Payload KG—25
HBM GB Unverified192—
Height CM—168
Memory Bandwidth TB S Unverified8—
Nvlink Generation5—
Nvlink GPU TO GPU TB S1.8—
Process NodeTSMC 4NP—
Rapid Charge Hours—1.5
Retirement Started—2025-11-19
RGB Cameras—6
Runtime Hours—5
Statusnot listed by NVIDIA—
Status Checked—2026-09-24
Successor—Figure 03
Successor BMW Project Announced—2026-06-25
Successor Introduced—2025-10-09
TDP Watts Unverified700—
Transistor Count Billion208—
Weight KG—70