Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 37 fields comparable

⇄ swap sides
SpecAuroraTesla Optimus
AcceleratorIntel Data Center GPU Max—
AI Stack—Tesla FSD-derived end-to-end neural networks (vision-only)
ArchitectureHPE Cray EX with Intel Exascale Compute Blade—
Battery KWH—2.3
Cores9,264,128—
CPUIntel Xeon CPU Max 9470 52C 2.4GHz—
Fremont Line Capacity Robots PER Year—1,000,000
Fremont Status Q2 2026—S/X lines decommissioned; Optimus lines being installed
Gen2 Announcement Date—2023-12-13
Gen2 Hand DOF—11
Gen2 Height CM—173
Gen2 Neck DOF—2
Gen2 Total DOF Unverified—28
Gen2 Walking Speed Boost PCT—30
Gen2 Weight KG—57
Gen2 Weight Reduction KG—10
Gen3 Announcement Quarter—Q1 2026
Gen3 Forearm Actuators—25
Gen3 Hand DOF—22
Gen3 Payload KG—20
Gen3 Production Target Superseded—summer 2026
Gen3 Total Actuators PER Robot—50
Gen3 Unveil Status—not unveiled as of 2026-09-23 (Tesla North)
Installation Year2,023—
InterconnectHPE Slingshot-11—
LocationDOE/SC/Argonne National Laboratory—
ManufacturerIntel / HPE—
Payload PER Hand KG—9
Power KW38,698.36—
Public Sale Target—end of 2027 (Musk at Davos, 2026-01-22)
Rmax Pflops1,012—
Rpeak Pflops1,980.01—
Runtime Hours Light Duty—8
Status Checked—2026-09-24
Top500 Rank Jun20264—
Top500 Rank Nov20253—
Walking Speed KM H—8