Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 43 fields comparable

⇄ swap sides
SpecNVIDIA DGX B200The Stargate Project
Abilene Trained Model—GPT-5.5
Abilene Trained Model Version—5.5
Bluefield3 Dpus2—
Capacity Added Prior 90 Days GW MIN—3
Capacity Added Window Days—90
Capacity Update Date—2026-04-29
CPU Base GHZ2.1—
CPU Count2—
CPU MAX Boost GHZ4—
CPU ModelIntel Xeon Platinum 8570—
Custom Silicon Announced—Broadcom (10 GW)
FP4 Pflops Dense72—
FP4 Pflops Sparse144—
FP8 Pflops72—
Gpus8—
HBM Bandwidth TB S64—
Height MM444—
Internal Storage TB30.72—
Length MM897.1—
MAX Power KW14.3—
Networking Osfp Ports4—
Nvswitch Count2—
Oracle Partnership GW—5
OSNVIDIA DGX OS / Ubuntu—
OS Storage TB3.8—
Partners—OpenAI, SoftBank, Oracle, MGX
PER Port Gbps MAX400—
Planned Capacity GW 2025—7
Planned Chip Count Million—2
Primary Accelerator Announced—NVIDIA GB200 (initial Oracle racks)
Primary Site—Abilene, Texas
Rack Units10—
Secondary Accelerator Announced—AMD Instinct (up to 6 GW)
Secured Capacity Commitment Deadline Year—2,029
Secured Capacity Commitment GW—10
Status Checked—2026-09-24
System Memory GB Default2,048—
System Memory GB MAX4,096—
Total CPU Cores112—
Total Hbm3e GB1,440—
Total Nvlink Bandwidth TB S14.4—
Total Planned Investment USD Billion—400
Width MM482.2—