Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 33 fields comparable

⇄ swap sides
SpecNVIDIA DGX H200The Stargate Project
Abilene Trained Model—GPT-5.5
Abilene Trained Model Version—5.5
Capacity Added Prior 90 Days GW MIN—3
Capacity Added Window Days—90
Capacity Update Date—2026-04-29
CPU2x Intel Xeon Platinum 8480C—
CPU Cores Total112—
Custom Silicon Announced—Broadcom (10 GW)
FP8 Petaflops32—
GPU Count8—
GPU ModelH200 SXM—
Internal Storage8x 3.84TB NVMe U.2—
MAX Power KW10.2—
Network MAX Gbps PER Port400—
Network Peak TB S1—
Network Ports8x ConnectX-7 single-port (4x OSFP)—
Nvlink PER GPU Bandwidth GB S900—
Nvswitch Bandwidth TB S7.2—
Nvswitch Count4—
Oracle Partnership GW—5
OS Storage2x 1.92TB NVMe M.2—
Partners—OpenAI, SoftBank, Oracle, MGX
Planned Capacity GW 2025—7
Planned Chip Count Million—2
Primary Accelerator Announced—NVIDIA GB200 (initial Oracle racks)
Primary Site—Abilene, Texas
Secondary Accelerator Announced—AMD Instinct (up to 6 GW)
Secured Capacity Commitment Deadline Year—2,029
Secured Capacity Commitment GW—10
Status Checked—2026-09-24
System Memory TB2—
Total GPU Memory GB1,128—
Total Planned Investment USD Billion—400