Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 40 fields comparable

⇄ swap sides
SpecNVIDIA DGX H200Tesla Optimus
AI Stack—Tesla FSD-derived end-to-end neural networks (vision-only)
Battery KWH—2.3
CPU2x Intel Xeon Platinum 8480C—
CPU Cores Total112—
FP8 Petaflops32—
Fremont Line Capacity Robots PER Year—1,000,000
Fremont Status Q2 2026—S/X lines decommissioned; Optimus lines being installed
Gen2 Announcement Date—2023-12-13
Gen2 Hand DOF—11
Gen2 Height CM—173
Gen2 Neck DOF—2
Gen2 Total DOF Unverified—28
Gen2 Walking Speed Boost PCT—30
Gen2 Weight KG—57
Gen2 Weight Reduction KG—10
Gen3 Announcement Quarter—Q1 2026
Gen3 Forearm Actuators—25
Gen3 Hand DOF—22
Gen3 Payload KG—20
Gen3 Production Target Superseded—summer 2026
Gen3 Total Actuators PER Robot—50
Gen3 Unveil Status—not unveiled as of 2026-09-23 (Tesla North)
GPU Count8—
GPU ModelH200 SXM—
Internal Storage8x 3.84TB NVMe U.2—
MAX Power KW10.2—
Network MAX Gbps PER Port400—
Network Peak TB S1—
Network Ports8x ConnectX-7 single-port (4x OSFP)—
Nvlink PER GPU Bandwidth GB S900—
Nvswitch Bandwidth TB S7.2—
Nvswitch Count4—
OS Storage2x 1.92TB NVMe M.2—
Payload PER Hand KG—9
Public Sale Target—end of 2027 (Musk at Davos, 2026-01-22)
Runtime Hours Light Duty—8
Status Checked—2026-09-24
System Memory TB2—
Total GPU Memory GB1,128—
Walking Speed KM H—8