Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 37 fields comparable

⇄ swap sides
SpecTesla OptimusAurora
Accelerator—Intel Data Center GPU Max
AI StackTesla FSD-derived end-to-end neural networks (vision-only)—
Architecture—HPE Cray EX with Intel Exascale Compute Blade
Battery KWH2.3—
Cores—9,264,128
CPU—Intel Xeon CPU Max 9470 52C 2.4GHz
Fremont Line Capacity Robots PER Year1,000,000—
Fremont Status Q2 2026S/X lines decommissioned; Optimus lines being installed—
Gen2 Announcement Date2023-12-13—
Gen2 Hand DOF11—
Gen2 Height CM173—
Gen2 Neck DOF2—
Gen2 Total DOF Unverified28—
Gen2 Walking Speed Boost PCT30—
Gen2 Weight KG57—
Gen2 Weight Reduction KG10—
Gen3 Announcement QuarterQ1 2026—
Gen3 Forearm Actuators25—
Gen3 Hand DOF22—
Gen3 Payload KG20—
Gen3 Production Target Supersededsummer 2026—
Gen3 Total Actuators PER Robot50—
Gen3 Unveil Statusnot unveiled as of 2026-09-23 (Tesla North)—
Installation Year—2,023
Interconnect—HPE Slingshot-11
Location—DOE/SC/Argonne National Laboratory
Manufacturer—Intel / HPE
Payload PER Hand KG9—
Power KW—38,698.36
Public Sale Targetend of 2027 (Musk at Davos, 2026-01-22)—
Rmax Pflops—1,012
Rpeak Pflops—1,980.01
Runtime Hours Light Duty8—
Status Checked2026-09-24—
Top500 Rank Jun2026—4
Top500 Rank Nov2025—3
Walking Speed KM H8—