Skip to content
MCS · Rigs · Compare

Side-by-side, with the numbers that matter.

Two rigs, one table. Higher numbers win in cobalt; TDP and price flip.

0 of 40 fields comparable

⇄ swap sides
SpecTesla OptimusNVIDIA DGX H200
AI StackTesla FSD-derived end-to-end neural networks (vision-only)—
Battery KWH2.3—
CPU—2x Intel Xeon Platinum 8480C
CPU Cores Total—112
FP8 Petaflops—32
Fremont Line Capacity Robots PER Year1,000,000—
Fremont Status Q2 2026S/X lines decommissioned; Optimus lines being installed—
Gen2 Announcement Date2023-12-13—
Gen2 Hand DOF11—
Gen2 Height CM173—
Gen2 Neck DOF2—
Gen2 Total DOF Unverified28—
Gen2 Walking Speed Boost PCT30—
Gen2 Weight KG57—
Gen2 Weight Reduction KG10—
Gen3 Announcement QuarterQ1 2026—
Gen3 Forearm Actuators25—
Gen3 Hand DOF22—
Gen3 Payload KG20—
Gen3 Production Target Supersededsummer 2026—
Gen3 Total Actuators PER Robot50—
Gen3 Unveil Statusnot unveiled as of 2026-09-23 (Tesla North)—
GPU Count—8
GPU Model—H200 SXM
Internal Storage—8x 3.84TB NVMe U.2
MAX Power KW—10.2
Network MAX Gbps PER Port—400
Network Peak TB S—1
Network Ports—8x ConnectX-7 single-port (4x OSFP)
Nvlink PER GPU Bandwidth GB S—900
Nvswitch Bandwidth TB S—7.2
Nvswitch Count—4
OS Storage—2x 1.92TB NVMe M.2
Payload PER Hand KG9—
Public Sale Targetend of 2027 (Musk at Davos, 2026-01-22)—
Runtime Hours Light Duty8—
Status Checked2026-09-24—
System Memory TB—2
Total GPU Memory GB—1,128
Walking Speed KM H8—