Skip to content

Blue Origin · In Development · us · Lander

Blue Moon Mk1

Single-launch lunar cargo lander; Pathfinder Mission 1 to validate BE-7 engine and precision landing.

Verified 2026-09-24

Operator page

Subsystems

propulsion↗

BE-7 engine: 44.5 kN (10,000 lbf) thrust, throttleable to 8.9 kN (2,000 lbf); dual-expander cycle; LOX/LH2 propellants.

avionics↗

Autonomous GNC for high-precision landing; avionics are among the systems the first mission (MK1-101 Endurance) is to validate.

thermal↗

Thermal vacuum testing completed at NASA Johnson Space Center.

power↗

Oxygen/hydrogen fuel cell power system.

comms↗

Continuous downlink communications validated as part of Pathfinder Mission objectives.

Specs & Metrics

Cargo Upmass ↑ better
3,000 kg
Max cargo to lunar surface
Maximum pressurized + unpressurized cargo delivered to station orbit (upmass), in kg.

Program roadmap

Blue Moon Mk1 program roadmap2027 Q1SlippedPathfinder Mission 1 — first MK…↗2027PlannedArtemis III — a test lander bas…↗20272028
  • slipped

    Pathfinder Mission 1 — first MK1 lander, Endurance; slipped from around the end of summer 2026 to wait on the New Glenn return to flight

    2027 Q1↗
  • planned

    Artemis III — a test lander based on the crewed Blue Moon Mark 2 docks with Orion in low Earth orbit; up to two crew enter it

    2027↗